Installed by contractor McDermott on behalf of an international operator, it is the second time the firm’s TCP product has been deployed in Malaysia, after a TCP Flowline and static riser were installed at the shallow water West Lutong field for operator Petronas in 2017.
Equinor, partners greenlight $1.3 billion investment for Johan Sverdrup Phase 3
Equinor and Aker BP are investing NOK 13 billion (~$1.29 billion USD) in the third phase of Johan...