The well will be drilled as a deviated hole with a total measured depth of approximately 7,500 m and is expected to take 50 – 60 days to drill and evaluate. The well lies within tie-back distance to both the Who Dat G subsea manifold (6 km) and the Who Dat FPS.
Brazil output rebounds despite November decline from Buzios platform shutdowns
Brazilian oil production is rebounding after platform outages slashed more than 300,000 bpd in...


