The well will be drilled as a deviated hole with a total measured depth of approximately 7,500 m and is expected to take 50 – 60 days to drill and evaluate. The well lies within tie-back distance to both the Who Dat G subsea manifold (6 km) and the Who Dat FPS.
SLB, Shearwater launch 3D seismic survey offshore Brazil
SLB and Shearwater have launched a 3D seismic survey offshore Amapá as exploration interest grows...

