Installed by contractor McDermott on behalf of an international operator, it is the second time the firm’s TCP product has been deployed in Malaysia, after a TCP Flowline and static riser were installed at the shallow water West Lutong field for operator Petronas in 2017.
Petrobras posts $19.6 billion profit in 2025 as production rises
Petrobras reported net income of $19.6 billion in 2025 as oil and gas production increased 11% to...

