Equinor has cut its 2026 production growth guidance to about 3% from 4% after a dropped-object incident shut in Bacalhau offshore Brazil and a fire took Visund offline. Johan Castberg is also running at minimum rates due to offloading problems.
Foresea reports $1.7-billion backlog, full fleet contracted through 2027
Brazilian driller Foresea, which drilled the first ultra-deepwater well in the Foz do Amazonas...
