Your Portal to Offshore Decommissioning Insights
  1. Home
  2. Offshore
  3. Foresea reports $1.7-billion backlog, full fleet contracted through 2027

Foresea reports $1.7-billion backlog, full fleet contracted through 2027

by | Nov 25, 2026 | Offshore

Brazilian driller Foresea, which drilled the first ultra-deepwater well in the Foz do Amazonas Basin, reports about $1.7 billion in backlog and says its full owned fleet is contracted to Petrobras through 2027.

Latest News

Categories