Based on the numbers our forecast, along with some anecdotal evidence from talking to industry professionals, I think it’s fair to say that the upstream industry is maintaining the status quo for the remainder of 2024, with great enthusiasm building for 2025.
How front-end engineering design (FEED) determines long-term FPSO outcomes
Early decisions made during front-end engineering design can shape an FPSO’s performance for...
