Installed by contractor McDermott on behalf of an international operator, it is the second time the firm’s TCP product has been deployed in Malaysia, after a TCP Flowline and static riser were installed at the shallow water West Lutong field for operator Petronas in 2017.
Equinor scales back Troll electrification to protect gas output
Equinor and Troll partners will skip a second electric compressor at Troll C, avoiding up to 21...
