The 3 MW floating wind turbine will be located 2 km west of the Culzean platform, 220 km offshore Scotland. This turbine, expected to be fully operational by end 2025, will supply around 20% of Culzean’s power requirement, thereby reducing its GHG emissions.
Chevron expands offshore Greece position with stake in Ionian Sea Block 10
Chevron has acquired a 70% stake and operatorship in Greece's offshore Block 10 concession,...
