The Fenix field is part of the Cuenca Marina Austral 1 (CMA-1) concession. With a production capacity of 10 MMcmd (70,000 boed), the Fenix development consists of a new unmanned platform, located in 70 m water depth and connected to the existing CMA-1 facilities.
How front-end engineering design (FEED) determines long-term FPSO outcomes
Early decisions made during front-end engineering design can shape an FPSO’s performance for...
