The first award is a “substantial” contract to design, engineer, and manufacture riser flexible pipe. The second award involves work to design, engineer, and manufacture subsea production systems to be deployed on the Atapu 2, Sepia 2, and Roncador projects.
How front-end engineering design (FEED) determines long-term FPSO outcomes
Early decisions made during front-end engineering design can shape an FPSO’s performance for...

